Introduction
The following environmental documentation was prepared as required by the California Environmental Quality Act (CEQA) and the National Environmental Policy ACT (NEPA):
- The Draft Environmental Impact Report (Draft EIR) for the San Gabriel River Discovery Center project was required by the CEQA. It is provided here as a supporting document of the Final Environmental Impact Report (see #2 below). [More Details]
- The Final Environmental Impact Report (Final EIR) was required by the CEQA and was approved by the Authority Board meeting at its meeting on January 20, 2010. [More Details]
- The Draft Environmental Assessment (Draft EA), was required by the NEPA, and was prepared by the Federal Lead Agency, U.S. Army Corps of Engineers. [More Details].
- The Final Environmental Assessment (Final EA), was required by the NEPA, and was prepared by the Federal Lead Agency, U.S. Army Corps of Engineers. [More Details].
