Home Page
Contact Us
About Us
Our Governing Board
Stakeholder Advisory Committee
Plans
Environmental Documentation
 Environmental Documentation
  •  Environmental Impact Report     •  Federal Document 
   

ENVIRONMENTAL IMPACT REPORT

The Final Environmental Impact Report (Final EIR) for the San Gabriel River Discovery Center project is provided for review. The Final EIR will be on the Authority Board meeting agenda, January 20th, 2010, for consideration for adoption. The FEIR is a large document and has been broken into the following components which can be downloaded as PDF files:

The Draft EIR includes Appendices as a separate document. Each is available as a separate PDF file below. Alternatively, one may choose to download individual sections, also available as PDF files below.

Subject: Notice of Availability (3-page PDF file) of a Draft Environmental Impact Report (see below) for the San Gabriel River Discovery Center at Whittier Narrows Project

Public Comment Period : The 60-day public comment period for the Draft EIR commenced on June 5, 2009 and concluded on August 3, 2009.

Public Meetings: Two public meetings were held in June and July 2009 to solicit input from interested parties on the content of the Draft EIR.

  • The first meeting was held on Wednesday, June 24, 2009 at South El Monte High School (1001 North Durfee Avenue in South El Monte, California) at 7:00 to 9:00 p.m.
  • The second meeting was held on Saturday, July 18, 2009 at the South El Monte High School (1001 North Durfee Avenue in South El Monte, California) at 2:00 to 4:00 p.m.

A slideshow was used to aid in describing the Draft EIR at the meetings. Click to download the slideshow (26 slides, 2.2 mb PDF file).

Public comments related to the contents of the Draft EIR were accepted at the public meetings.

   

Back to Top of Page